Major Experiences

PROJECT NAME CLIENT  LOCATION TYPE OF PLANT,

CAPACITY

WORK

 SCOPE

PROJECT

PERIOD

Annual Overhaul of Turbine & Generator PT.  Aspex Kumbong

Located in Cileungsi Indonesia

20MW Co-Gen (Oil & Gas Firing) O & M Dec 2002
Operation & Maintenance Consulting PT Miwon Surabaya

PT IMCI Lampung Indonesia

4×4.8 MW CCPP

5.5 MW STG Plant

O & M Nov ~De 2002
Major Overhaul of Co-Gen Power Plant

And  added Air-Preheated

PT Indomiwon Citra Inti, Lampung 5.5MW Co-Gen PP (Oil Firing) EPC Jun~ Jul 2003
Additional  Water Treatment System PT Aspex Kumbong / Cileungsi Bogor 60 T/D Demi Water Plant EPC Jun~Oct 2003
Analysis of  Operation PT Innedonghwa Co.Ltd. Balikpapan 6 MW Wood Chip Co-Gen Plant EPC Aug  2003
The Repairing of 60 T/H Wood Chip Boiler

& Overhaul of 6 MW Steam Turbine Generator

PT Balikpapan Forest Industry 6 MW Wood Chip Co-Gen Plant EPC Sep 2003
New Work Shop Power Distribution PT Daekyung Heavy Industry, Cilegon New Work Shop EPC Feb  2004
Electrical System Analysis PT Cheil Samsung INdonesia PLN – 25 MW, GTG – 16 MW Eng.

Service

Apr 2004
Fabrication of Platform and Ladders PT Daekyung Heavy Industry, Cilegon Tower for Balongan Blue Sky Project EPC Apr 2004
Improvement  Santa Maria Church Santa Maria Church Water Supply and D/G Installation EPC Sep 2004
Improvement of Grounding System PT Cheil Samsung Indonesia GTG Co-Gen EPC Dec 2004 – Oct 2005
The Overhaul of Steam Turbine 6 MW & 3.5 MW PT. Bade Makmur Orissa

(Korindo Group)

Co-Gen Plant of  6MW & 3.5 MW Service Nov 2004
Construction of Aux.Boiler &  3 Unit of HRSG

for Tuban Aromatic Project

DKME Co., Ltd. Aux.Boiler (90 T/H) & HRSG (3×75 T/H) C Oct 2004 – Nov 2005
Fabrication of Duct, By-pass & Main Stack and  Steel Structure of  HRSG for Tuban Aromatic Project DKME Co., Ltd. Three Units (3×75 T/H) of HRSG PC  Dec 2004 – July2005
Electrical Work PT. Moving Tech Electrical Work

(PLN Permit & Power Distribution)

EPC May – July 2005
Scada System for Electrical PT. Cheil Jedang Indonesia Scada System for Electrical EPC Sep – Dec 2005
Instrument and Mechanical Works for ME-2 Expansion Feed Project PT. Cabot Indonesia Instrument and Mechanical Works EPC Nov 2005 – Apr 2006
Aspex  Kumbong Incinerator Project PT. Aspex Kumbong Incinerator -650ton/day,

Steam boiler – 25ton/hr

PC Dec 2005- Jul  2006
Project Schedule Management PT. Kirin Miwon Food Overall Project Management E Jun 2006 – Sep 2007
Dismantle of Process Equipment at N-Project PT. Kirin Miwon Food Equipment & Steel  Structure C Aug – Oct. 2006
C3 Area for N-Project PT. Kirin Miwon Food Steel  Structure works PC Nov 2006 – Jun 2007
Water Treatment System at ASPEX KEMBONG Shin Woo, In Korea 30 m² DEMIN Water Treatment PC Mar 2007 – Jul 2007
DYC Project PT. DYC GARTECH Architect, Civil & Steel Structure EPC Sep2007 – Aug 2008
3300 Unit for N-Project ITL Co., Ltd. / Lampung Piping, Steel structure, Instrument PC Dec 2006 – Aug 2007
Patra SK L-Project SK E&C / Dumai, Riau Instrument  & Insulation Works C Sep 2007 – Jun 2008
Khurais Central Processing Project Hyundai E&C / Saudi Piping & Mechanical Works C Oct 2007 – Jan 2009
G – PROJECT PT. Kirin Miwon Food  / Lampung Civil, Mechanical, Electrical EPC Feb 2008 – May 2009
DEB ADD ON CCPP at BATAM PT. Hyundai Engineering / Batam Civil, Mechanical, Electrical C Mar 2009 – May 2010
Tanjung Priok Tank Terminal PT. Ssangyong E&C / Jakarta Piping Work C Mar 2009 – Apr 2010
Factory Construction PT. Daehan Global / Sukabumi Civil, Mechanical, Electrical EPC Aug 2009 – Mar 2010
Factory Construction PT. Koin Baju / Sukabumi Civil, Mechanical, Electrical EPC Mar 2011 – Dec 2011
School(JIKS) Building Construction Soehee Construction  / Jakarta Mechanical, Electrical C Jan 2011 –  Aug 2012
Krakatau Posco Temporary Electrical Work Posco E&C / Cilegon Electrical Work C Aug 2011 –  Jul 2012
7.3MW Biomass Fired Power Plant KTH /  Central Kalimantan Civil, Mechanical, Electrical C Mar 2012 – Apr 2013
Krakatau Posco COKE  Electrical Work Posco E&C / Cilegon Electrical Work C Aug 2012 – Jan 2014
Krakatau Posco COKE  Mechanical Work Posco E&C / Cilegon Mechanical Work C Aug 2012 – Jan 2014
Krakatau Posco CPCT Krakatau Engineering / Cilegon Mechanical Work C Dec 2012 – Jan 2014
Krakatau Posco RMH Krakatau Engineering / Cilegon Mechanical Work C Dec 2012 – Jan 2014
Electrical Certificate Work Posco E&C / Cilegon SLO (Sertifikat Laik Operasi ) Work Mar 2013 – Dec 2013
Maintenance of Facilities Korindo Group / Kalimantan Maintenance Turbine & Boiler May 2013 – Apr 2015
Krakatau Posco Chemtech Poschem Dong-Suh Chemical Civil, Mechanical, Electrical C Aug 2013 – Apr 2014
Elevator Work for Lime Calcining Plant KP Chemtech Calcination Civil, Electrical, Steel Structure EPC Aug 2014 – Nov 2014
Samarinda Pellet Plant PT. Kyung Dong Mineral IDN Mechanical, Electrical C Sep 2014 – March 2015
Aspex Steam Turbien Expansion Project Dohwa/ Cileungsi Civil, Mechanical & Electrical Work C May 2015  – May 2016
Sarulla Geothermal Power Plant 3 X 110MW Hyundai E & C/ Sumatera Utara Temporary Facilities Work

Building & Mechanical Work

C Oct 2014 – Dec 2017
Kalsel-1 Coal Fired Power Plant 2 x 100MW Hyundai Engineering/ Kalimantan Temporary Facility Work,

Civil Work

C Jul 2016 – On Going
Crude Coal Tar Storage Tank & Related Work PT. Krakatau Poschem Dong-Suh Chemical / Cilegon Steel Structure Mech. Installation Work EPC Mar 2017 – On Going
Tj. Jati B Coal Fired Power Plant 2 x 1,000MW Jurong Engineering / Jepara Boiler & Bunker Steel Structural Work 27.000 Tons C Apr 2018 – On Going